Overview
If any of the GPOs inside the FUYL™ Locker bays fail and need to be replaced we have this guide to perform this action
Procedure
- Unplug the FUYL Locker from it's power source and allow it to completely dissipate any power (Wait 30s).
- Open the side panel of the FUYL Locker
- Ensure the 5-way PDU was disconnected from the mains inlet in step 1 and remove the secure sleeve. Undo the Velcro Ties that secure the 5-way PDU’s cable.
- Undo the thumbscrews on the 5-way PDU then slide the 5-way PDU to the left and remove it.
- Reverse steps 3 & 4 to install the replacement 5-way PDU.
- Ensure all cable routing is neat and secure in the Maintenance Access Panel. Do a mechanical check on the Maintenance Access Panel to ensure it opens and closes easily, locks securely and does not foul or chafe on the cables.