Procedure
- Unplug the FUYL™ Locker from it's power source and allow it to completely dissipate any power (Wait 30s).
- Open the Maintenance Access Panel.
- Ensure Mains Power Cable was unplugged from the top of the 12V PSU during step 1.
- Unplug the 12V PSU from the 12V Distribution Cable and thread it out back through the grommets.
- Undo the screw at the bottom of the clamping bracket with the Torx screwdriver.
- Slide the clamping bracket upwards and lift it off, then rotate the 12V PSU out of the bracket and remove it.
- Perform steps 3-6 in reverse to install the replacement 12V PSU. Note the Indicator Light on the 12V PSU should be positioned so it faces outwards. Ensure all cable connections are firm and secure and that the cables in the Control Door shelf does not obstruct the opening and closing of the Control Door.